Terminals

The Rogue Valley International-Medford Airport covers 366 hectares at an elevation of 407 meters. The terminal has one asphalt runway (14/32) that is 8 800 meters long.

After recent renovations, the new terminal was established at the Rogue Valley International-Medford Airport. On the second floor, the new terminal has an observation deck, restaurant, and second-story landing bridges. The terminal has one primary and two open-air concourses at the terminal. In 2008 30-meter-high control tower was built with an investment of $3.6 million. The tower uses a modern geothermal system for climate control of the building.

Information